The installation of 3 × 50 MW (150 MW DC) large utility scale solar power plant is ground based using ventilated polycrystalline module technology with fixed tilt angle of 28° in a 750-acre land, and the site is located about 115 km northeast of Karachi, Pakistan, near the town of ThanoBula Khan, Nooriabad, Sindh. This plant will be connected to the utility distribution system through a national grid of 220 kV outgoing double-loop transmission line. The 3 × 50 MW solar PV will be one of the largest tied grid-connected power projects as the site is receiving a rich average solar radiation of 158.7 kW/h/m2/month and an annual average temperature of about of 27°C. The analysis highlights the preliminary design of the case project such as feasibility study and PV solar design aspects and is based on a simulation study of energy yield assessment which has all been illustrated. The annual energy production and energy yield assessment values of the plant are computed using the PVSYST software. The assumptions and results of energy losses, annual performance ratio (PR) 74.73%, annual capacity factor 17.7%, and annual energy production of the plant at 232,518 MWh/year are recorded accordingly. Bear in mind that reference recorded data indicates a good agreement over the performance of the proposed PV power plant.
from #AlexandrosSfakianakis via Alexandros G.Sfakianakis on Inoreader http://ift.tt/2jdKCQc
via IFTTT
Εγγραφή σε:
Σχόλια ανάρτησης (Atom)
Δημοφιλείς αναρτήσεις
-
Background Moyamoya angiopathy (MMA) is characterised by a progressive stenosis of the terminal part of the internal carotid arteries and th...
-
Abstract The core mission of the Early Stage Professionals in Molecular Imaging Sciences (ESPMIS) Interest Group is to help young scientist...
-
Point of view: Electrophysiological endpoints differ when comparing the mode of action of highly successful... Point of view: Electrophysiol...
-
Abstract Background A reported penicillin allergy may compromise receipt of recommended antibiotic prophylaxis intended to prevent surgica...
-
Objectives A major measure of treatment success for drug users undergoing rehabilitation is the ability to enter the workforce and generate ...
-
In view of the performance requirements (e.g., ride comfort, road holding, and suspension space limitation) for vehicle suspension systems, ...
-
Related Articles Feasibility of Brain Atrophy Measurement in Clinical Routine without Prior Standardization of the MRI Protocol:...
-
Rejuvenation Research , Vol. 0, No. 0. from #AlexandrosSfakianakis via Alexandros G.Sfakianakis on Inoreader http://ift.tt/2EFILxo via I...
-
Publication date: 28 September 2017 Source: Journal of Controlled Release, Volume 262 Author(s): Barbara Crivelli, Theodora Chlapanidas, S...
Δεν υπάρχουν σχόλια:
Δημοσίευση σχολίου