In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve deliverables within applicable due times and deadlines.
from #AlexandrosSfakianakis via Alexandros G.Sfakianakis on Inoreader http://ift.tt/1SrVDp8
via IFTTT
Εγγραφή σε:
Σχόλια ανάρτησης (Atom)
Δημοφιλείς αναρτήσεις
-
from #AlexandrosSfakianakis via Alexandros G.Sfakianakis on Inoreader http://ift.tt/2o3fxRd via IFTTT
-
from #AlexandrosSfakianakis via Alexandros G.Sfakianakis on Inoreader http://ift.tt/2pf2BXI via IFTTT
-
Nephrolithiasis accelerates the renal failure in the patients with ADPKD. In order to evaluate the role of percutaneous nephrolithotomy in m...
-
A mass-change-based method based on output-only data for the rescaling of mode shapes in operational modal analysis (OMA) is introduced. The...
-
by Maggie Zgambo, Balwani Chingatichifwe Mbakaya, Fatch Welcome Kalembo Background Malaria is the main cause of morbidity and mortality amo...
-
Voice alterations in patients with Morquio A syndrome. J Appl Genet. 2017 Dec 23;: Authors: Szklanny K, Gubrynowicz R, Tylki-Szymańsk...
-
Communicate solutions that will reduce the impact of humans on the land, water, air, and/or other living things in the local environment.* ...
-
Cancer Cytopathology Mark above section as read Case Reports in Pathology Mark above section as read Clinical Anatomy Mark above section as ...
-
An analytic method together with the Mie scattering theory and Beer-Lambert law is proposed for the characteristic parameter determination o...
Δεν υπάρχουν σχόλια:
Δημοσίευση σχολίου